In many suburban societies, two problems quietly sit in the background for decades. The original builder never obtained an occupation certificate (OC) from BMC. And over the years, someone added a floor on the terrace, enclosed balconies, or built extra rooms. Life goes on, until redevelopment starts and the architect compares the building with the approved plans.
Is your society considering redevelopment? Get a free first assessment of your plot from Mungekar Realty: what it can support, which regulation applies and what to watch out for. The society pays us nothing. Register your property or WhatsApp us on +91 98207 44734.
No OC: what it means
An OC confirms that a building was completed as per approved plans and is fit to occupy. Buildings without one often pay higher water charges or property tax penalties, and members may find home loans and sales harder. For redevelopment:
- The lack of an OC alone does not usually stop redevelopment, provided the building was constructed with approved plans and permissions.
- What matters most is how much of the existing building is authorised, because that decides the existing area that counts.
- Missing approvals or plans can make conveyance and title work harder, so collect whatever records exist.
Unauthorised floors and extensions: the bigger problem
Under redevelopment rules, unauthorised construction is generally not counted as existing built-up area. This matters in two ways:
- For the whole society: incentives such as the extra area for existing societies under DCPR 33(7)(B) (15% of existing built-up area or 10 sq m per tenement, whichever is more) are calculated on the authorised area only.
- For individual members: a member whose flat is on an unauthorised floor, or who has an unauthorised extension, may not have a legal entitlement to that area in the new building.
How societies usually handle it
- Regularise where possible. BMC has policies to regularise some unauthorised work on payment of penalties, if it fits within permissible FSI and safety norms. Check this early.
- Treat members fairly by agreement. Many societies agree with the developer that members on unauthorised floors will still get a flat, paid for out of the sale component. This is a negotiated benefit, not a legal right, so it must be written clearly into the DA.
- Be transparent. Hiding the issue from developers backfires when the architect surveys the building. Declare it upfront and price it into the offers.
- Separate the authorised and unauthorised parts in the feasibility report, so members understand exactly what each will get.
If you are buying in an old building
Before buying a flat in an old building likely to go for redevelopment, check the approved plans and OC status, and confirm that the flat you are buying is authorised. An unauthorised flat can look like a bargain today and cost you your place in the new building tomorrow.
First steps
- Get copies of the approved plans, commencement certificate and any OC or completion certificate from BMC records.
- Have an architect survey the building and compare it with the approved plans.
- Discuss the findings openly in a general body meeting.
- Decide, before tendering, how unauthorised areas will be treated in the redevelopment.
Building without an OC, or with extra floors? Mungekar Realty helps societies across Mumbai assess their authorised area and plan redevelopment that is fair to every member. Call 98207 44734 or visit mungekarrealty.com.
This article is general information and not legal advice. Regularisation policies and redevelopment rules change; consult an architect and advocate for your building.